Insights

Construction Watch: The West End

Construction Watch: The West End

Located on a 2.4-acre parcel at 240-260 Lakefront Boulevard, the 20 three-story townhouses will each have three bedrooms, 3.5 bathrooms, a two-car attached garage, and 2,700 to 3,500 sq.ft. of living space.

26 sec

Buffcast: Interview with developer Paul Ciminelli

Buffcast: Interview with developer Paul Ciminelli

During Paul's interview with Buffalo Rising, numerous pertinent issues facing Buffalo’s development scene were discussed, including preservation, the mega-region, parking lots, walkability, weather, and condos.

17 min

Construction starts on downtown grocery, apartments

Construction starts on downtown grocery, apartments

Ciminelli confirmed that all of the urban fill soil has been removed from the site at 201 Ellicott St. as part of a state-supervised remediation. That effort will eventually see the 2.5-acre site readied for construction into a 220,000-square-foot development after decades as a city-owned parking lot.

41 sec